Home
|
Store Locations
|
Community
|
About Us
|
Employment
|
Contact Us
Carpet
Area Rugs
Tile
Vinyl
Luxury Vinyl Tile
Laminate
Hardwood
Green
Introduction to Hardwood
Hardwood Product Catalog
Types of Hardwood
Choosing Hardwood
Before Your Wood Arrives
Hardwood Upkeep
Hardwood Terminology
Design Resources
Before Your Hardwood Arrives
Before installation day
relocate furniture
empty china cabinets and closets
consider removal and disposal of old floorcovering
remove it yourself and leave 1 day before install
for carpet, leave tack strips and pull out staples
Trim
moldings and baseboards removed for additional costs
installers not responsible for breakage
painted baseboards, woodwork and paint may need retouching (your responsibility)
Sub flooring
may need to be prepared
new sub floor may be required
a job best left to the professionals
Door plan
possibility that doors may not clear the new floor and swing free
installers may remove doors and re-hang for an additional cost
for clearance issues, arrange for a qualified carpenter to shave or cut down
Clean-up
waste will be produced
waste collected and disposed of by installers at an additional cost
Installation day
be home and available
be prepared for questions
presence insures the right wood is installed in the right areas
exact time of arrival cannot be guaranteed, only a time frame
Safety
installers use tools and techniques that can be hazardous
make sure that children and pets are out of the work area
follow through with a walk-through
prior to completion, walk through and ask questions to be clear on any final details